Concrete volume and bag calculator

How much concrete do I need and what will it cost?

Concrete volume is length × width × depth for a slab, or cylinder volume × count for round piers. Add your margin and divide litres by bag yield; cost uses your own bag price.

Concrete volume and bag calculator

Enter your own SEK prices per complete package or piece as labelled. Zero means that cost has not been budgeted. Labor and delivery are added separately.

Your details
m
m
m
%
l

Product instructions. Dimensions and product data determine quantities rounded up for purchase. Check cutting plans and actual consumption before ordering.

SEK

Enter your own SEK prices per complete package or piece as labelled. Zero means that cost has not been budgeted. Labor and delivery are added separately.

SEK

Enter your own SEK prices per complete package or piece as labelled. Zero means that cost has not been budgeted. Labor and delivery are added separately.

SEK

Enter your own SEK prices per complete package or piece as labelled. Zero means that cost has not been budgeted. Labor and delivery are added separately.

Results update instantly

Calculate materials

Example using default values

Enter your own SEK prices per complete package or piece as labelled. Zero means that cost has not been budgeted. Labor and delivery are added separately.

Total budget
SEK 0

Result details

Geometric volume
0.6 m³
Volume including waste
0.66 m³
Concrete bags
55
Result details

Result details

Material subtotal
SEK 0
Analysis & guidance
  • How quantities are calculated

    Dimensions and product data determine quantities rounded up for purchase. Check cutting plans and actual consumption before ordering.

  • What should you check?

    Bag yield means litres of finished concrete, not dry bag weight. Defaults are editable assumptions, not universal product values. The model does not specify concrete class, reinforcement, frost protection or load capacity. Check the chosen product sheet and project design; the bag price does not price separately ordered ready-mix.

  • Prices and budget

    Enter your own SEK prices per complete package or piece as labelled. Zero means that cost has not been budgeted. Labor and delivery are added separately.

About this calculator

Concrete volume and bag calculator

How much concrete do I need and what will it cost?

Concrete volume is length × width × depth for a slab, or cylinder volume × count for round piers. Add your margin and divide litres by bag yield; cost uses your own bag price.

A slab has volume length × width × depth. A cylinder has volume π × (diameter ÷ 2)² × height. Multiply by identical casts and the selected margin. Multiply m³ by 1,000 and divide by the product’s litres of finished concrete per bag; round up to complete bags.

Worked example

The prices below are illustrative inputs, not market prices. Replace them with your quotes or store prices.

Length: 2 m; Width: 3 m; Depth / height: 0.1 m; Number of identical casts: 1. Geometric volume: 2 × 3 × 0.1 = 0.6 m³. Waste: 10% → volume including waste: 0.66 m³ = 660 l.

Concrete yield per bag: 12 l → 660 / 12 = 55 concrete bags. Price per concrete bag: 50 SEK → material subtotal: 2 750 SEK. Labor budget: 100 SEK; Delivery budget: 200 SEK → total budget: 3 050 SEK.

How many bags do four round piers need?

Choose cylinder, diameter 0.2 m, height 0.5 m and count 4. With a 10% margin and 12 litres of finished concrete per bag, buy 6 whole bags. These are example dimensions, not a pier design recommendation.

π × (0.2 / 2)² × 0.5 × 4 ≈ 0.062832 m³

0.062832 × 1.10 × 1000 ≈ 69.115 l; 69.115 / 12 ≈ 5.76 → 6

What is excluded from the material budget?

Bag yield means litres of finished concrete, not dry bag weight. Defaults are editable assumptions, not universal product values. The model does not specify concrete class, reinforcement, frost protection or load capacity. Check the chosen product sheet and project design; the bag price does not price separately ordered ready-mix.

Enter your own SEK prices per complete package or piece as labelled. Zero means that cost has not been budgeted. Labor and delivery are added separately.

Product instructions: Weber.

Planning an outdoor area too? Calculate separate materials with the paving calculator or deck calculator. This concrete quantity does not determine how their foundations should be designed.

How to read this calculator

These results are meant as guidance. They are based on rules, assumptions, and simplified models that can differ from your exact real-world situation.

Estimate, not a legal decision

Use the result as decision support and planning help. For high-stakes choices, confirm the details with the relevant authority, lender, employer, or adviser.

Methodology

Each calculator uses defined inputs, assumptions, and logic. We explain the broader approach on the methodology page.

Read methodology

Sources and updates

Important calculators should be traceable back to official rules, public guidance, or other clearly stated references.

Read about sources

Product instructions

Continue calculating